LG Chem delivered and installed batteries for a 7 MW/3 MWh system in Minster, Ohio. The battery system has been combined with a 4.2 MW solar PV array as well. The S&C Electric Company provided construction, engineering, battery system integration, and procurements. Half Moon Ventures and the local utility also collaborated on the project. The [&hellip
7 MW LG Chem Battery System Installed In Minster, Ohio was originally published on CleanTechnica.
To read more from CleanTechnica, join over 50,000 other subscribers: Google+ | Email | Facebook | RSS | Twitter.
No comments:
Post a Comment